Today while returning back in bus I was completely involved in reading another book which I got from flipkart.After 100 minutes of reading I looked through the window shocked to see bus was in saidapet, a route taken only by 23C. Then I remembered that the Cenotaph-turnbulls road flyover is getting opened for people to use.
I remember they have started building this flyover some 10 months ago ,it was supposed to be completed by November but given the rain and some legal issues it got delayed but not long enough ending our misery.Construction of this flyover caused an agonising delay adding salt to wounds of the tiresome trip we endure every day.It was a challenge for drivers to take us through the narrow residential area without hitting gates,walls and their flower pots.
Above is the map of the area, the red line is the route taken by vehicles beacuse of the construction of flyover and the width of the lanes would be no more than 30 feet.From tomorrow we can zoom past via the green line.Since this is a shortest route from IT highway to mount road, this area used to be the bottle neck of the traffic jam.Now with the flyover built we have to wait and see how good it is to easy the traffic flow.Hope it doesn't transfer the bottle neck to the next junction.
No comments:
Post a Comment